PDF Return
C. 6
To: Board of Supervisors
From: Brian M. Balbas, Public Works Director/Chief Engineer
Date: August  11, 2020
The Seal of Contra Costa County, CA
Contra
Costa
County
Subject: APPROVE a Right of Way Contract-Temporary Construction Easement with Sportsmen, Inc., Antioch Area.

APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE

Action of Board On:   08/11/2020
APPROVED AS RECOMMENDED OTHER
Clerks Notes:

VOTE OF SUPERVISORS

AYE:
John Gioia, District I Supervisor
Candace Andersen, District II Supervisor
Diane Burgis, District III Supervisor
Karen Mitchoff, District IV Supervisor
Federal D. Glover, District V Supervisor
Contact: Olivia Reynolds-Freeman 925. 957-2462
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown.
ATTESTED:     August  11, 2020
David Twa,
 
BY: , Deputy

 

RECOMMENDATION(S):

As the governing body of the Contra Costa County Flood Control and Water Conservation District (District), APPROVE and AUTHORIZE the Chief Engineer, or designee, to execute a right of way contract and temporary construction easement with Sportsmen, Inc., to acquire a temporary construction easement on property located at 3301 Wilbur Avenue, Antioch, for payment of $1,000, in connection with the Drainage Area 29G Storm Drain Line A Repair Project. (Project No. 0330-6W9C14 [DCD-CP#19-30]).  
  

AUTHORIZE the Auditor-Controller to issue a check in the amount of $1,000, payable to Sportsmen, Inc., c/o Treasurer, PO Box 518, Antioch, CA 94509, to be forwarded to the Real Estate Division for delivery.

FISCAL IMPACT:

100% County Drainage Maintenance - General Fund  
  
  
  

BACKGROUND:

DA29, Line A is located on a private road (Maritime Way) within District storm drain easements, near Wilbur Avenue, in an unincorporated area of Antioch. Currently, the roadway is compromised due to two (2) sections of underlying 48-inch plastic pipe that is failing. Both sections of roadway are covered by trench plates to allow access to facilities at the end of the road.  
  
The purpose of this Project is to replace two (2) damaged sections of plastic pipe and restore roadway integrity. The first pipe to be replaced is approximately 1,200 feet north of Wilbur Avenue. The second pipe to be replaced is behind the Sportsmen Yacht Club gate, approximately 500 feet north of the first section of pipe. The Project also includes roadway excavation and replacement, dewatering and trench shoring and protection; adjusting utilities; installing construction area signs; providing a staging area; and offsite disposal of all removed material. Appropriate Best Management Practices will be implemented during construction activities.  
  
Under the right of way contract, the District will acquire a 6 month temporary construction easement from Sportsmen, Inc., for payment of $1,000. The District will also indemnify Sportsmen, Inc. from liabilities that arise from the Project. District and Real Estate staff recommend approval of the right of way contract to acquire necessary property rights for the Project, as planned.  

CONSEQUENCE OF NEGATIVE ACTION:

The Project will not have sufficient land rights to allow for construction in accordance with approved plans and specifications.   

AgendaQuick©2005 - 2024 Destiny Software Inc., All Rights Reserved