To: Board of Supervisors
From: Julia R. Bueren, Public Works Director/Chief Engineer
Date: May  24, 2016
The Seal of Contra Costa County, CA
Contra
Costa
County
Subject: APPROVE the Morgan Territory Road Bridges 4.30 & 4.40 Scour Repair Project and related actions under the CEQA, Clayton area.

APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE

Action of Board On:   05/24/2016
APPROVED AS RECOMMENDED OTHER
Clerks Notes:

VOTE OF SUPERVISORS

AYE:
John Gioia, District I Supervisor
Candace Andersen, District II Supervisor
Mary N. Piepho, District III Supervisor
Karen Mitchoff, District IV Supervisor
Federal D. Glover, District V Supervisor
Contact: Alex Nattkemper, (925) 313-2364
cc: Liza Mangabay     Leigh Chavez     Jenna Caldwell    
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown.
ATTESTED:     May  24, 2016
David Twa,
 
BY: , Deputy

 

RECOMMENDATION(S):

APPROVE the Morgan Territory Road Bridges 4.30 & 4.40 Scour Repair Project (Project) and AUTHORIZE the Public Works Director, or designee, to advertise the Project, Clayton area. [County Project No. 0662-6U4145, DCD-CP# 15-30] (District III)  
  

DETERMINE the Project is a California Environmental Quality Act (CEQA), Class 1(c) Categorical Exemption, pursuant to Article 19, Section 15301(c) of the CEQA Guidelines, and  

  

RECOMMENDATION(S): (CONT'D)
DIRECT the Director of Conservation and Development to file a Notice of Exemption with the County Clerk, and  
  
AUTHORIZE the Public Works Director to arrange for payment of a $25 fee to Conservation and Development for processing, and a $50 fee to the County Clerk for filing the Notice of Exemption.

FISCAL IMPACT:

This project is funded 100% Local Road Funds.  

BACKGROUND:

The purpose of this project is to repair scour damage and bank erosion at two bridges located on Morgan Territory Road. Bridges 4.30 and 4.40 are similar structures that cross Marsh Creek and are located approximately 200 feet apart from each other. The project consists of installing rip rap (rock) on embankment slopes, placing a reinforced concrete slab in the channel below each bridge, filling voids in the boulder abutments with mortar, removal of trees where stability has been undermined due to erosion, repairing and replacing existing bridge railings with timber posts and guardrail system barriers, and installation of guardrail at the bridge approaches. These improvements will strengthen the bridge abutments and extend the service life of the existing bridges.   

CONSEQUENCE OF NEGATIVE ACTION:

Delay in approving the project may result in a delay of design, construction, and may jeopardize funding.