PDF Return
C. 6
To: Board of Supervisors
From: Brian M. Balbas, Public Works Director/Chief Engineer
Date: April  9, 2019
The Seal of Contra Costa County, CA
Contra
Costa
County
Subject: Adopt Resolution Requesting that the Flood Control District Adopt Annual Parcel Assessments for the County’s Watershed Program. Project #7517-6W7091

APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE

Action of Board On:   04/09/2019
APPROVED AS RECOMMENDED OTHER
Clerks Notes:

VOTE OF SUPERVISORS

AYE:
John Gioia, District I Supervisor
Candace Andersen, District II Supervisor
Diane Burgis, District III Supervisor
Karen Mitchoff, District IV Supervisor
Federal D. Glover, District V Supervisor
Contact: Michelle Cordis, (925) 313-2381
cc: Laura Strobel, County Administrator's Office     Bob Campbell, County Auditor–Controller’s Office     Dorothy Lim, County Auditor-Controller’s Office     Tim Jensen, Flood Control     Michelle Cordis, Flood Control     Cece Sellgren, County Watershed Program     Patrick Melgar, Flood Control     Catherine Windham, Flood Control    
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown.
ATTESTED:     April  9, 2019
David Twa,
 
BY: , Deputy

 

RECOMMENDATION(S):

ADOPT Resolution No. 2019/105 establishing a rate of $30 per Equivalent Runoff Unit (ERU) for Stormwater Utility Area 17 (Unincorporated County) for Fiscal Year 2019–2020 and requesting that the Contra Costa County Flood Control and Water Conservation District (FC District) adopt annual parcel assessments for drainage maintenance and the National Pollutant Discharge Elimination System Program, Countywide.

FISCAL IMPACT:

The 2019–2020 rate per ERU is the same as that set for fiscal year 2018–2019. Therefore, there will be no change in rate for Unincorporated County property owners. The unincorporated area of Contra Costa County will produce approximately $3,479,000, which will be used to implement the Unincorporated County’s Watershed Program. All associated costs funded 100% by Stormwater Utility Area 17 Funds.









BACKGROUND:

The Clean Water Program consists of the County, Contra Costa cities, and the FC District working together to prevent, reduce, or eliminate the discharge of pollutants into the storm drain system, including creeks and other natural waterways. The Clean Water Program was established in response to changes in the Federal Clean Water Act. The Program is known at the federal level as the National Pollutant Discharge Elimination System (NPDES) Program. In order to be in compliance with the current NPDES permit, Clean Water Program participants implement a Stormwater Management Plan stipulating a set of activities and a performance or service level. The Stormwater Management Plan is a major component of the Joint Municipal NPDES Stormwater Permit with the California Regional Water Quality Control Boards and is paid for with stormwater utility fee assessments. Adoption of the attached resolution will begin the annual process of assessment adoption.  
  
The Board of Supervisors is being asked to set a rate of $30 for one ERU in the Unincorporated County areas and to request that the FC District adopt the stormwater utility assessment. (The FC District is the only entity under state law with legal authority to assess this particular assessment.)  
  
The Public Works Department coordinates the County Watershed Program for the County. Examples of how the assessment is being spent in the current year include:  
  
1. General drainage maintenance to remove debris and sediment from County storm drain systems, flood control channels, and creeks.  
  
2. Targeted street sweeping throughout the County.  
  
3. Work with County Building Inspection and Public Works inspectors and construction companies/contractors to reduce construction contaminants, such as paint, cement, oil/fuels, and soil erosion from entering storm drains and creeks.  
  
4. Encourage Planners and the development community to use new designs that will reduce contaminated stormwater runoff.  
  
5. Educate the public on the benefits of reducing pesticides and other toxic household product use and their proper disposal.  
  
6. Educate County Engineers and Maintenance staff on flood control design, construction, and maintenance practices that protect water quality and preserve natural watershed habitats.  
  
7. Inspection of industrial and commercial businesses for evidence that spill prevention, equipment maintenance and cleaning, waste handling and disposal, and other business practices are done in a manner that minimizes stormwater contamination.  
  
8. Educate marina operators and their marina users through a marina program.

CONSEQUENCE OF NEGATIVE ACTION:

If the rate per ERU is not set for the coming fiscal year, funds will not be available for the County’s Watershed Program to comply with the Joint Municipal NPDES Stormwater Permit. The Regional Water Quality Control Boards have the authority to issue fines of up to $10,000 per day against those municipalities that do not comply with the Permit and fail to implement their Stormwater Management Plans.

AgendaQuick©2005 - 2024 Destiny Software Inc., All Rights Reserved