The FC District provides regional flood protection, technical information, hydrology data and education to cities and residents, and environmental stewardship for over 70 miles of streams and several detention basins as part of the County’s flood protection system. The FC District prepares and reviews designs prepared by others that modify the existing flood protection system and require fluvial geomorphology professional services in these efforts. In many cases, the flood protection facility proposed for modification was constructed by the U.S. Army Corps of Engineers or the U.S. Department of Agriculture Natural Resources Conservation Service, which means following their standards, policies, and procedures. In executing modifications to the flood control system, the FC District, at times, requires additional temporary services from persons specially trained, experienced, expert, and competent to perform professional engineering services. For that reason, the FC District is entering into this Contract with Consultant. Under this Contract, Consultant will provide professional engineering services relating to fluvial geomorphology on an on-call basis for a variety of FC District projects, whether proposed by the FC District or outside agencies, throughout Contra Costa County.
The Contract limits the Consultant’s liability for damages arising out of its errors or omissions in providing professional services under the Contract to $5,000,000, the amount stated in the Consultant’s professional liability insurance policy provided. This is for professional liability and does not limit the Consultant’s responsibility with regard to general liability claims.
Without the approval of the Board of Supervisors, the FC District will be unable to obtain on-call services for professional engineering and technical services relating to fluvial geomorphology.