To: Board of Supervisors
From: Julia R. Bueren, Public Works Director/Chief Engineer
Date: February  3, 2015
The Seal of Contra Costa County, CA
Contra
Costa
County
Subject: APPROVE and AUTHORIZE Advertisement of Roof Replacement at 2099 Arnold Industrial Way, Concord (WH286B)

APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE

Action of Board On:   02/03/2015
APPROVED AS RECOMMENDED OTHER
Clerks Notes:

VOTE OF SUPERVISORS

AYE:
John Gioia, District I Supervisor
Candace Andersen, District II Supervisor
Mary N. Piepho, District III Supervisor
Karen Mitchoff, District IV Supervisor
Federal D. Glover, District V Supervisor
Contact: Ramesh Kanzaria, (925) 313-2000
cc: PW Accounting     PW CPM Interim Division Manager     PW CPM Project Manager     PW CPM Clerical     Auditor's Office     County Counsel's Office     County Administrator's Office     County Administrator's Office    
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown.
ATTESTED:     February  3, 2015
David Twa,
 
BY: , Deputy

 

RECOMMENDATION(S):

1. APPROVE the design and bid documents, including the plans and specifications, for the Roof Replacement at 2099 Arnold Industrial Way, Concord project.  

  

RECOMMENDATION(S): (CONT'D)
2. DETERMINE that the project is a California Environmental Quality Act (CEQA) Class 1a Categorical Exemption; DIRECT the Director of Conservation and Development, or designee, to promptly file a Notice of Exemption with the County Clerk; and DIRECT the Public Works Director, or designee, to arrange for payment of the $25 handling fee to the County Clerk for filing the Notice of Exemption and the $25 handling fee to the Department of Conservation and Development for processing costs.  
  
3. AUTHORIZE the Public Works Director, or designee, to solicit bids to be received on or about March 12, 2015 and issue bid addenda, as needed, for clarification of the bid documents, provided the involved changes do not significantly increase the construction cost estimate.  
  
4. DIRECT the Clerk of the Board to publish, at least 14 calendar days before the bid opening date, the Notice to Contractors in accordance with Public Contract Code Section 22037, inviting bids for this project.  
  
5. DIRECT the Public Works Director, or designee, to send notices by email or fax and by U.S. Mail to the construction trade journals specified in Public Contract Code Section 22036 at least 15 calendar days before the bid opening.  

FISCAL IMPACT:

Funding for this project is provided by the General Fund.

BACKGROUND:

Plans and specifications for the project have been prepared for the Public Works Department by LCA Architects and filed with the Clerk of the Board by the Public Works Director. The construction cost estimate is $300,000 and the general prevailing wage rates are on file with the Clerk of the Board of Supervisors and will be the minimum rates paid on this project.  
  
The roof at the facility was identified in the Facilities Life-Cycle Investment Program report as being in poor condition and in need of replacement. The roof has begun leaking in a few spots. The project scope includes the removal and replacement of existing roofing, flashing, drains and skylights.

CONSEQUENCE OF NEGATIVE ACTION:

If the project is not approved, the roof will continue to deteriorate and develop more leaks, causing damage to the building interior, resulting in costly repairs in the future.

CHILDREN'S IMPACT STATEMENT:

Not applicable.