RECOMMENDATION(S):
Acting as the governing body of the Contra Costa County Flood Control and Water Conservation District (FC District), APPROVE and AUTHORIZE the Chief Engineer, or designee, to execute an Assignment and Assumption of Contract and Consent between WRECO and HDR Engineering, Inc., for on-call fluvial geomorphology assessment services with no change in the contract term or payment limit, Countywide.
FISCAL IMPACT:
There is no fiscal impact with this action. However, these services, including the contract, will be funded by 100% FC District Funds (Project No.: Various).
BACKGROUND:
The FC District has a contract with WRECO dated August 19, 2019, for on-call fluvial geomorphology assessment. The term of this contract expires August 18, 2023. On July 21, 2021, WRECO (assignor) sold 100% of its stock to HDR Engineering, Inc., a Nebraska Corporation (assignee). WRECO desires to assign the contract to HDR Engineering, Inc., and HDR Engineering, Inc., desires to assume the contract and all obligations therein.
|