To: Board of Supervisors
From: Brian M. Balbas, Public Works Director/Chief Engineer
Date: October  20, 2020
The Seal of Contra Costa County, CA
Contra
Costa
County
Subject: APPROVE the Byron Highway Bridge Replacement Project and take related actions under CEQA, Byron area.

APPROVE OTHER
RECOMMENDATION OF CNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE

Action of Board On:   10/20/2020
APPROVED AS RECOMMENDED OTHER
Clerks Notes:

VOTE OF SUPERVISORS

AYE:
John Gioia, District I Supervisor
Candace Andersen, District II Supervisor
Diane Burgis, District III Supervisor
Karen Mitchoff, District IV Supervisor
Federal D. Glover, District V Supervisor
Contact: Laura Cremin 925-313-2015
cc: Laura Cremin     Ave' Brown    
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown.
ATTESTED:     October  20, 2020
David Twa,
 
BY: , Deputy

 

RECOMMENDATION(S):

APPROVE the Byron Highway Bridge Replacement Project (Project) and AUTHORIZE the Public Works Director, or designee, to advertise the Project, Byron area. [Project No. 4660-6X1048] DCD-CP# 19-36 (District III), and  
  

FIND, on the basis of the whole record, including the proposed Initial Study/Mitigated Negative Declaration and any comments received and staff responses thereto, that there is no substantial evidence the Project may have significant effect on the environment, and that the Mitigated Negative Declaration reflects the independent judgment and analysis of the lead agency, Contra Costa County (County).  

RECOMMENDATION(S): (CONT'D)
  
ADOPT the Mitigated Negative Declaration and Mitigation and Monitoring Reporting Program for the Project.  
  
SPECIFY that the Contra Costa County Public Works Director is the custodian of the documents and other material that constitute the record of proceedings upon which the Board’s decision is based, and that the record of proceedings is located at 255 Glacier Drive, Martinez, CA.  
  
DIRECT the Director of Conservation and Development to file a Notice of Determination with the County Clerk, and,  
  
AUTHORIZE the Public Works Director to arrange for payment of $2,406.75 for California Department of Fish and Wildlife fees, a $50 fee to the County Clerk for filing the Notice of Determination, and a $25 fee to Department of Conservation and Development for processing.  

FISCAL IMPACT:

Estimated Project cost: $23,000,000. 89% Federal Highway Bridge Program, 8% State Department of Water Resources, 3% Local Road Funds.

BACKGROUND:

The purpose of this Project is to replace the existing bridge with a multi-span concrete bridge approximately 360 feet long, and a clear width of approximately 40 feet. The Project would also make approximately 1,350 total feet of roadway improvements on both sides of the new structure (approx. 2,700 feet of new roadway total). The proposed road and bridge would realign Byron Highway slightly to the south. In its final configuration, the replacement bridge would accommodate two lanes of vehicular traffic (one in each direction) with no increase in capacity. The proposed bridge would have eight-foot wide shoulders on both sides of the road. The eight-foot shoulders would meet American Association of State Highway and Transportation Officials (AASHTO) minimums and would be consistent with the countywide Bicycle and Pedestrian Plan that would accommodate a Class 2 facility with buffer striping at the Project site. The work also includes modified connections for four access roads near the ends of the bridge and modification of the Bruns Road intersection. The project will require relocation of communication lines (overhead and underground) and overhead electric distribution facilities and a relocation/extension of a siphon/culvert owned by Byron Bethany Irrigation District near Bruns Road. Underground utilities are attached to cross the existing bridge and would need to be relocated onto the new bridge including an 8-inch Chevron Oil line and 12-inch Natural Gas line. The proposed bridge would accommodate these utilities as well as capacity for future underground lines as well.

CONSEQUENCE OF NEGATIVE ACTION:

Delay in approving the project may result in a delay of design, construction, and may jeopardize funding.  
  